• 00 (44) 1664 568055
  • Email us: projects@gwpltd.co.uk

Business & Industry

GWP  were appointed by O2 to design their new Foodservice Facility within the new Headquarters Building in Slough.

O2 are consolidating its operations onto one site with a final population of over 1300 people. Two buildings are being connected by a futuristic link building which will house the new restaurant.

In addition to the restaurant area GWP are responsible for the design of the meeting room design areas and 3 Cafes.

The operation is designed to reflect the O2 branded image and sustainability goals.

This is genuinely one of the largest staff feeding projects in London, the original brief indicated a nominal load of 4500 users per day passing through the foodservice facilities, peaking to an incredible 7000 per day during sale periods and the lead up to Christmas. Our role included the design of several separate branded outlets within the staff dining area preparing and serving a range of international offers as well as all service points and a central washing facility.

Located on the shore of Lake Geneva the new corporate HQ for JTI brings together a truly International Design Team lead by US Architects Skidmore Owens and Merrill. The construction is well underway and scheduled for completion in 2015. The foodservice facilities have been designed to cater for the International make-up of the HQ staff brought together in a very futuristic 21st Century Interior.